Not cast eh. Freaken awsome looking wall anyways. tks muzy : )
You guys set up a conventional to set up a tower?
Actually, a hydro crane big enough to erect a tower that size and that high would require even more space on the ground than a crawler conventional, and I say every square inch of space is spoken for at that spot.
What are the bases of those tower cranes like?
Actually, a hydro crane big enough to erect a tower that size and that high would require even more space on the ground than a crawler conventional, and I say every square inch of space is spoken for at that spot.
Well I certainly wouldn't argue the space required for the outrigger spread, my thoughts were about the space and time to assemble and erect the conventional boom.
Well I certainly wouldn't argue the space required for the outrigger spread, my thoughts were about the space and time to assemble and erect the conventional boom.
And another bridge Beam job but a different deal,New design with the beams running side by side and cables pulling them tight together.Well at least it new for Missouri LOL..........Don't even get a concrete deck.Overlays with asphalt.
You would be correct about the space required to assemble the rig. But it would be a temporary operation, a short lane closure. A good crew that's got their ducks in a row can knock the boom in a conventional and have it in the air in short order.