• Thank you for visiting HeavyEquipmentForums.com! Our objective is to provide industry professionals a place to gather to exchange questions, answers and ideas. We welcome you to register using the "Register" icon at the top of the page. We'd appreciate any help you can offer in spreading the word of our new site. The more members that join, the bigger resource for all to enjoy. Thank you!

Things done at Work

Tiny

Senior Member
Joined
Jan 24, 2010
Messages
2,126
Location
NW Missouri
Just stuff done the last few weeks. Moved the ac180 in to set beams for 150 & 71 Highways
8 5  10 007R.jpg

Had to take the swing out section of jib off.The beams were at the end of the chart.removing the jib gave the operator a little comfort zone

8 5  10 008R.jpg

it was heavier than you think

8 5  10 009R.jpg
 

Attachments

  • 8 5  10 010R.jpg
    8 5 10 010R.jpg
    137.7 KB · Views: 7,173
  • 8 5  10 011R.jpg
    8 5 10 011R.jpg
    138.6 KB · Views: 7,142

Tiny

Senior Member
Joined
Jan 24, 2010
Messages
2,126
Location
NW Missouri
Had some pipe to unload 65 feet long and 8,000 lbs.Minor boss said "you could do it yourself but I'm sending help any way.

8 12 10 003R.jpg

Then run up by the airport and unloaded a connex box from Denmark . Dang thing stunk , Rendering outfit from what a understood.
8 12 10 004R.jpg
8 12 10 005R.jpg
 
Last edited:

Tiny

Senior Member
Joined
Jan 24, 2010
Messages
2,126
Location
NW Missouri
I think you can see a theme because we have been setting beams all over the country lately.
8 12 10 007R.jpg
Nice 90 ton Lima
8 12 10 008R.jpg

8 12 10 014R.jpg
this bridge is odd because there is no back wall
8 12 10 017R.jpg

8 12 10 018R.jpg
 
Last edited:

Tiny

Senior Member
Joined
Jan 24, 2010
Messages
2,126
Location
NW Missouri
5150 to Raytown ,Manbasket work to help with a church .
 

Attachments

  • 8 18 10 005R.jpg
    8 18 10 005R.jpg
    158.3 KB · Views: 6,724
  • 8 18 10 004R.jpg
    8 18 10 004R.jpg
    133.6 KB · Views: 6,694
  • 8 18 10 003R.jpg
    8 18 10 003R.jpg
    64.3 KB · Views: 6,731

Tiny

Senior Member
Joined
Jan 24, 2010
Messages
2,126
Location
NW Missouri
And another bridge Beam job but a different deal,New design with the beams running side by side and cables pulling them tight together.Well at least it new for Missouri LOL..........Don't even get a concrete deck.Overlays with asphalt.
 

Attachments

  • 8 18 10 011R.jpg
    8 18 10 011R.jpg
    159 KB · Views: 6,589
  • beams 001R.jpg
    beams 001R.jpg
    197.4 KB · Views: 6,604
  • beams 002R.jpg
    beams 002R.jpg
    183.8 KB · Views: 6,540
  • beams 008R.jpg
    beams 008R.jpg
    225.1 KB · Views: 6,549
  • beams 009R.jpg
    beams 009R.jpg
    201.2 KB · Views: 6,513

Tiny

Senior Member
Joined
Jan 24, 2010
Messages
2,126
Location
NW Missouri
Had two hydros up there because the 100 ton machine in the background had a broken wire going to the computer that they didn't find until we were done.
 

Attachments

  • beams 015R.jpg
    beams 015R.jpg
    171.7 KB · Views: 6,389
  • beams 014R.jpg
    beams 014R.jpg
    193.5 KB · Views: 6,418
  • beams 011R.jpg
    beams 011R.jpg
    248.6 KB · Views: 6,478
  • beams 016R.jpg
    beams 016R.jpg
    205.5 KB · Views: 6,369
  • beams 018R.jpg
    beams 018R.jpg
    156.7 KB · Views: 6,325
Last edited:

02Dmax

Senior Member
Joined
Dec 4, 2007
Messages
687
Location
MO
nice pics Tiny, wheres that rural bridge at with the new deck design? I'm from St. Joe and run around down around the city alot.
 

CM1995

Administrator
Joined
Jan 21, 2007
Messages
13,351
Location
Alabama
Occupation
Running what I brung and taking what I win
Interesting pics Tiny, thanks for sharing. I moved this thread to the crane forum form TGIF.

Do you have any more info on the "deckless" bridge beams that get overlaid with asphalt?
 

Tiny

Senior Member
Joined
Jan 24, 2010
Messages
2,126
Location
NW Missouri
nice pics Tiny, wheres that rural bridge at with the new deck design? I'm from St. Joe and run around down around the city alot.

Ludlow Missouri , south west of Chilicothe Missouri by 10 miles
 
Last edited:

Tiny

Senior Member
Joined
Jan 24, 2010
Messages
2,126
Location
NW Missouri
Its a different deal with these bridges.No normal decking lumber , Just set the beams and asphalt...They do get a concrete wall. Keiwit company is the prime on 550 bridge jobs .

This deal was started two years ago and so far they have 50 done.Trouble is Missouri is broke and Keiwit is fronting all this.So the 4 year time limit is probably a non factor.

But they went in with the idea of just a couple of designs that fit all.All these bridge have real short time limits.Longest we have had is 54 days so far.Its a nightmare for the job foreman to get the right stuff going and to keep making the next step.

It is hard on man power because these guys have been the same hands on everyone of these bridges this summer.The hands are tired.

Basically a lesser traveled bridge will get the box beams and asphalt and busy highways get conventional I beams and precast deck panels

http://www.ktuconstructors.com/

http://www.ktuconstructors.com/project/faq.asp
 
Last edited:

CM1995

Administrator
Joined
Jan 21, 2007
Messages
13,351
Location
Alabama
Occupation
Running what I brung and taking what I win
Thanks for the info Tiny on the project. I found this site if anyone else is interested on the MO bridge replacement program.
 

Tiny

Senior Member
Joined
Jan 24, 2010
Messages
2,126
Location
NW Missouri
Ok , Here go's today.Hauled the Jib to the 718 this morning . It and an m250 and a 5120 Grove are all on one job building a soccer stadium . Missed getting a pic but the Operators stuck the jib together in the yard . Hauled it 70 feet long . Anyway here are some pics of that job


1 11 111 013R.jpg

1 11 111 009R.jpg

1 11 111 018R.jpg

1 11 111 019R.jpg[/ATTACH]1 11 111 009R.jpg.
 

Attachments

  • 1 11 111 012R.jpg
    1 11 111 012R.jpg
    174.2 KB · Views: 6,179

DaveVB

Active Member
Joined
Mar 12, 2007
Messages
26
Location
Kansas City, Mo
Occupation
Maintenance Tech at Private Bible College
I live/work off of 155th street so have been watching the new bridge at 150 highway.
Have you had anything to do with the 435 bridge they are putting in?
 

Tiny

Senior Member
Joined
Jan 24, 2010
Messages
2,126
Location
NW Missouri
No Sir , I'm assuming your asking about the emergency repair job? A company named Pyramid is doing that one
 