Tiny
Senior Member
Atco that was changed before the other one went back up , That was the rigging used by the former op for that machine . It didn't take much to talk this op into swapping for longer rigging .
Atco that was changed before the other one went back up , That was the rigging used by the former op for that machine . It didn't take much to talk this op into swapping for longer rigging .
Makes backing in a little odd with seeing the river moving in your mirrors
clouds really screw with you while running a crane also, gives you the sensation that the crane may still be swinging. especially on a windy day with small broken cloud cover
Is this one of JE Dunns tower cranes?