• Thank you for visiting HeavyEquipmentForums.com! Our objective is to provide industry professionals a place to gather to exchange questions, answers and ideas. We welcome you to register using the "Register" icon at the top of the page. We'd appreciate any help you can offer in spreading the word of our new site. The more members that join, the bigger resource for all to enjoy. Thank you!

Wind farm crane

JTL

Senior Member
Joined
Dec 2, 2008
Messages
761
Location
Pacific Nortwest U.S.A.
Occupation
IUOE Local 302
A couple pics from a wind farm project, next to where Im working.
 

Attachments

  • oregon 016.jpg
    oregon 016.jpg
    17.2 KB · Views: 1,783
  • oregon 023.jpg
    oregon 023.jpg
    35.6 KB · Views: 1,760
  • oregon 027.jpg
    oregon 027.jpg
    36.5 KB · Views: 1,731
  • oregon 041.jpg
    oregon 041.jpg
    32.5 KB · Views: 1,708
  • oregon 042.jpg
    oregon 042.jpg
    32.7 KB · Views: 1,720

dirt digger

Senior Member
Joined
Feb 11, 2008
Messages
598
Location
PA
Occupation
pushing dirt, baling hay, and hitting the books
theres a video of that process somewhere on Youtube...pretty sweet
 

greywynd

Well-Known Member
Joined
Apr 25, 2005
Messages
225
Location
Peterborough, Ontario
I keep wondering, what sort of base are these things on? There must be some dirt moved for them.....anyone been involved in it or know anything about it?
 

John C.

Senior Member
Joined
Jun 11, 2007
Messages
12,870
Location
Northwest
Occupation
Machinery & Equipment Appraiser
Where is that project at? I've been to the Ellensburg farm and seen the one by Bickleton from a distance but both of those are in desert areas. There's too much grass in those photos.

Great shots of the crane.

Thanks!
 

JTL

Senior Member
Joined
Dec 2, 2008
Messages
761
Location
Pacific Nortwest U.S.A.
Occupation
IUOE Local 302
Where is that project at? I've been to the Ellensburg farm and seen the one by Bickleton from a distance but both of those are in desert areas. There's too much grass in those photos.

Great shots of the crane.

Thanks!

This is just south of Arlington, Oregon on Highway 19. We are digging a new cell at the landfill just up the road.
Jason
 

greywynd

Well-Known Member
Joined
Apr 25, 2005
Messages
225
Location
Peterborough, Ontario
Greywynd, I have posted some imformation with photos here: https://www.heavyequipmentforums.com/Forum/showthread.php?t=7186
Post no: 23.

Rn'R.

Dang...I'd seen the first of that thread, and the end (oops!) but had missed teh wind farm stuff. Those towers look identical to the ones they are putting up here in some areas of Ontario.

Any idea the size of the hole for the base? Hard to tell from the pictures, nothing really to tell the scale. Looks big, understandably, just curious as to how big. :):)
 

RocksnRoses

Senior Member
Joined
Jun 14, 2008
Messages
770
Location
South Australia
Occupation
Owner operater crushing & contracting business
Any idea the size of the hole for the base? Hard to tell from the pictures, nothing really to tell the scale. Looks big, understandably, just curious as to how big. :):)

The hole is about 50 - 60 feet across and 7 - 8 feet deep. I think the concrete footing was about 40 feet diameter and nearly 6 feet thick. These footings took about 200 cubic meters of concrete and they were for 1.5 megawatt generators. The bigger generators would have larger footings. After they poured all of the bases, they actually went and dug around them again and poured another meter width of concrete right around the base. I am not quite sure why, but they must have been a bit nervous about something. If you Google Wind Tower Footings, or Wind Tower Foundations, there is quite a bit of imformation on the dimensions of various wind towers.

Nice shots of the crane, JTL, they had a 400 ton crane at the windfarm here, but I didn't get to see it.

Rn'R.
 

surfer-joe

Senior Member
Joined
Mar 25, 2007
Messages
1,403
Location
Arizona
Saw a lot of wind farm machinery going up this summer. Passed by this farm as construction was getting settled in.
 

equippartsdir

Well-Known Member
Joined
Nov 18, 2007
Messages
63
Location
OHIO
Wind Farm Foundations

Okay Fellas,
This is my first attempt at posting pics. Hope it works!
 

Attachments

  • DSC00372 (2).JPG
    DSC00372 (2).JPG
    45.4 KB · Views: 1,365
  • DSC00373 (2).JPG
    DSC00373 (2).JPG
    40.8 KB · Views: 1,363

farm_boy

Senior Member
Joined
Dec 12, 2006
Messages
369
Location
The sunflower state
Here are a few picts taken earlier this year while i was on a wind farm job.
 

Attachments

  • PIC_0083.JPG
    PIC_0083.JPG
    159.2 KB · Views: 1,376
  • PIC_0091.JPG
    PIC_0091.JPG
    209.9 KB · Views: 1,375
  • PIC_0086.JPG
    PIC_0086.JPG
    190.8 KB · Views: 1,362
  • PIC_0079.JPG
    PIC_0079.JPG
    161.9 KB · Views: 1,369
  • PIC_0058.JPG
    PIC_0058.JPG
    161.8 KB · Views: 1,367

JTL

Senior Member
Joined
Dec 2, 2008
Messages
761
Location
Pacific Nortwest U.S.A.
Occupation
IUOE Local 302
Wow! Thanks for the foundation pics Farm Boy. I would have never thought the bases would be that big. I just assumed they would dig a hole strait down, put a basket in and fill it with concrete.
The pics make more sence though. Spread the wieght out over a larger base, a bigger area to absorb the rotation mass. Pretty interesting!
Jason
 

Steve Frazier

Founder
Staff member
Joined
Oct 30, 2003
Messages
6,628
Location
LaGrangeville, N.Y.
They are huge! I wonder how many yards of concrete total? One thing that surprises me is the cold joints between the base footing and dome shaped base, then again with the connection for the column. I'd think it would be stronger if it were poured as a unit, or at least with keyways.
 

digger242j

Administrator
Joined
Oct 31, 2003
Messages
6,654
Location
Southwestern PA
Occupation
Self employed excavator
I imagine that would be a pretty tricky pick for the crane operator too, since they generally only build those things where it's, ya know...windy.
 

JTL

Senior Member
Joined
Dec 2, 2008
Messages
761
Location
Pacific Nortwest U.S.A.
Occupation
IUOE Local 302
I took my pics on a Sunday. I was taking the girl friend out to show her around my job and to peek around the wind farm. The week before the wind blew like mad for 3 days. The safety dude I was talking to said they can only pick when the winds blowing less than 10mph. Kinda like making hay when the sun shines!!
Jason
 

RocksnRoses

Senior Member
Joined
Jun 14, 2008
Messages
770
Location
South Australia
Occupation
Owner operater crushing & contracting business
They are huge! I wonder how many yards of concrete total?

The footings for the towers here took approximately 300 cubic yards of concrete to support 1.5 megawatt generators. I would imagine that the 2 and 3 megawatt generators would have even larger footings.

Rn'R.
 

EZ TRBO

Senior Member
Joined
Jul 21, 2007
Messages
862
Location
USA
Occupation
Aggregate Utility, Maintence Welder
I know that the ones that will soon be going up in Southwest Wisconsin are calling for 450 cubic yards of concrete per tower. Talking right now one area is looking at 35 to 47 towers. When work starts I'll be sure to have pics, just hope right now our company is able to secure the rock and concrete for the project.

Trbo
 

ConstSite

Well-Known Member
Joined
Jan 1, 2007
Messages
96
Location
Minnesota
Occupation
Construction
The crane in the first few photos of this post looks like the "new" Kobelco SL6000 from Buckner Heavylift. That should be the same crane that was on display at ConExpo earlier this year.

Hey EZ Trbo, when and where is that wind farm going up? What's the name?

- Chris
 
Top