Well i ordered a new 2007 Isuzu NPR HD with a 11' Service body.
Should have the truck in two weeks so it can go in to get painted black and green. The body should be ready in 4 weeks painted black. I endeded up geting a 11' Knaphide open service body with the insidedof the bed and top of the box with Rhino lining and also there are going to be putting a 18" custom platform on the rear to mount a small crane.
Should have the truck in two weeks so it can go in to get painted black and green. The body should be ready in 4 weeks painted black. I endeded up geting a 11' Knaphide open service body with the insidedof the bed and top of the box with Rhino lining and also there are going to be putting a 18" custom platform on the rear to mount a small crane.