Monday 9/12/16 Not do much happening.......ground drop a LOAD of shingles for a church here in town. Yes I know, I was really heavy, but it was only 2 blocks away.
This was my load that I didn't get till 3pm. So by the time I pulled it & loaded, it was 4. Got to the job site @ 4:30 and grabbed the first piece of rock @ 4:45. It was a kinda late night. 125 - 54"x12'x1/2", 80 - 4'x12'x5/8", & 30 - 4'x8'x1/2" MR. Not the biggest load, but still enough.
Please excuse my filthy truck
It's been a long couple with lots of rain, muddy job sites & some gravel roads