CAT D9H
Senior Member
We have a problem , we were going to finish a road using base course. the road is 15' wide with a fence on each side we are using a 140G , the problem is the dump truck driver didnt wait for anyone to show up to help him dump so the driver dumped three 12 yard loads of base in the middle of the road , 2 of the piles are dumped together and the last was dumped about 15 feet away from the first 2 piles. the rest of the problem is we only have the blade on site and it will take another day to bring in a machine with a bucket to knock down the piles. How would YOU knock the piles down with out taking out the fence or bringing in another machine?