928G Boy
Senior Member
I operated that little 302.5, with it I trimmed the walls of the shaft you see it being lifted out of. A 325 longreach excavator did the bulk of the work, anywhere the 325 operator couldn't reach, I would dig with the 302.5. It was hard digging, tons of rocks. The 302.5 took a real beating.