Here's where I've been lately its no often I work with a crew normally I'm solo or just have a grade checker with me. First pic and a wider view in the second pic is/was the hole/landfill I dug out and picked through. You can see my cut slope just past the scrapers that was about 15' deeper filled with trash. I picked the bigger stuff and everything I could out with the hoe the rest was hand work. We filled/overloaded 7 rolloff dumpsters with trash, 2 rolloffs with steel (car bodies, motors, appliances), and 3 end dumps with concrete. That area will be filled another 15' or so. And the last pic is what’s next on my list I have to recut this slope around 2 sides of the job must be 1000' at least at a 2:1. This is the easy side the other side there is a side walk running up and 2 retaining walls I have to cut out for at the same time. We are trying to take the boss into getting our D3 or D4 out there to clean up the slope and cut the curb and sidewalk grade at the bottom or I get to do it yippy tracking down the 2:1.