willie59
Administrator
Had a building fire near me not long ago. A demo crew showed up to remove the remains of the structure. I've heard it said that demo crews can be "resourceful" when finding ways to achieve a task. LoL. I've seen this done on 4100 Mantiwoc cranes, but don't recall seeing a 320 Cat with a rear window air conditioning unit before. Didn't take the liberty of crawling around on the machine to determine how they're getting their AC electricity.