Madill cable assist with Tigercat 870c feller, Link Belt heel boom shovelling, excavator processor on roadside.
Should there be two machines shovelling to keep up with the Feller Buncher?
Could a plain grapple shovel faster (less weight in the boom) than the heel boom Link Belt that has more weight extended on the slope?
A dual bogey Tigercat skidder or clambunk (even some self loading crane forwarders) could pull most of that terrain or are the enviromental rules so strict in the logging area that this terrain can only be track machine shovelled or cable logged (heli uneconomic)?
Could try bulldozer/ excavator tether machine, Madill felling/ bunching, Tiger cat shovelling and Linkbelt- shovelling/ fleeting/ loading and processor base - (processing/ loading)