Went back this week and graded the pad out did most of it with the 35 that machine is really growing on me
The biggest thing that needed addressed was the power service to the panel it ran through the new driveway that was getting cut almost 3 feet so we relocated it about 6 foot deep from existing grade the current line was direct burial and only about 2 feet to 3 feet deep in the process we ripped out the sewer line funny part was it was broke when they put the power service in the first time cause it came apart at a fernco coupling witch I reused so the homeowner wasn't put out
I bet i cut and graded close to 200 yards of dirt in about a day and a half