I didn't want to mess up another guys thread but he reminded me of an old bridge project ....
Completed in September 2008, this was a Design/Build contract for a 2,222 foot long, curvilinear, cable stayed bridge, over the Missouri River at Omaha, NE. this project, not only involved our cranes, but also Flexi-floats and a prefabricated steel trestle bridge, for a crane runway.