MODOT is resurfacing some roads in my area. Overlaying asphalt. At the bridges they "mill" the surface removing previous overlayment down to concrete. Then lay asphalt to match the road surface at the ends of the bridge. So they end up with a couple dump truck loads of millings.
At a bridge in my township they decided my road a couple hundred yards from the bridge needed millings. So they dumped it there.
Okay, I had just applied our annual rock allocation. Okay, I'll deal with it. Then under closer examination I found a LOT of this.
So I contacted my Township Board members and had them each go look at the road. They all agreed it needed removed. Contacted the contractor and got no argument. Also required the road be graveled. No argument. So to prevent a CTL ripping my roadbed all to hell trying to capture the millings I piled it with the grader.
Then had a dump truck load of gravel applied. Much better. Our State Tax Money at work......
At a bridge in my township they decided my road a couple hundred yards from the bridge needed millings. So they dumped it there.
Okay, I had just applied our annual rock allocation. Okay, I'll deal with it. Then under closer examination I found a LOT of this.
So I contacted my Township Board members and had them each go look at the road. They all agreed it needed removed. Contacted the contractor and got no argument. Also required the road be graveled. No argument. So to prevent a CTL ripping my roadbed all to hell trying to capture the millings I piled it with the grader.
Then had a dump truck load of gravel applied. Much better. Our State Tax Money at work......