dsgsr
Well-Known Member
I've been asked to give a quote on re-doing a camp road approximately 600 700 ft.
it's very hill-ly/steep 50 too 60 degrees or so. Sub-grade is solid granite. Whats on it now is rotten granite and it's washing away/ruts 5-8inch deep. I was thinking whatever is put on it would have to have a steep center to edge grade maybe 2" to every 1' over an 8' drive. Whats the best material?
Thank you
David
it's very hill-ly/steep 50 too 60 degrees or so. Sub-grade is solid granite. Whats on it now is rotten granite and it's washing away/ruts 5-8inch deep. I was thinking whatever is put on it would have to have a steep center to edge grade maybe 2" to every 1' over an 8' drive. Whats the best material?
Thank you
David