• Thank you for visiting HeavyEquipmentForums.com! Our objective is to provide industry professionals a place to gather to exchange questions, answers and ideas. We welcome you to register using the "Register" icon at the top of the page. We'd appreciate any help you can offer in spreading the word of our new site. The more members that join, the bigger resource for all to enjoy. Thank you!

Trenchers

Mass-X

Well-Known Member
Joined
Nov 18, 2006
Messages
167
Location
CA
Wasn't sure if I should put this here or in the "Mills" Forum, so if it's in the wrong place, feel free to move it.

Anyone here operate trenchers or work around them much? I really like working around the machines, especially the new Terrain Leveler that Vermeer has introduced. It's pretty cool to watch a 385C smoke it's teeth across the top of solid rock and then have one of these things come in and saw through it like butter.

This is a Vermeer T1055 with a 16' bar, 32" cutting width, sawing pipe trench. CA Johnson Trenching was the subcontractor we hired to do the trenching. www.cajohnsontrenching.com
 

Attachments

  • Trencher 1 (Small).jpg
    Trencher 1 (Small).jpg
    40 KB · Views: 1,275
  • Trencher 2 (Small).jpg
    Trencher 2 (Small).jpg
    45 KB · Views: 2,087
  • Trencher 7 (Small).jpg
    Trencher 7 (Small).jpg
    70.2 KB · Views: 2,221
  • Trencher 9 (Small).jpg
    Trencher 9 (Small).jpg
    56.5 KB · Views: 1,327
  • Trencher 3 (Small).jpg
    Trencher 3 (Small).jpg
    34.9 KB · Views: 1,404
Last edited:

JimInOz

Senior Member
Joined
Apr 15, 2008
Messages
534
Location
Victoria, Australia
Trenching for electric line

Nice trencher pics...thanks.
I just worked on a pipeline job that had a 50 ton Vermeer ....we had to get a permit to go near it.

On a different note,my Dad needs to dig a trench (450 Metres long)for underground power cable to his house.
I told him that a trencher is best for the job,but he seems to think a backhoe will be required.The ground is hard clay & broken mudstone in places.I think it will be a shared trench with phone line in there too....so it may be up to 3 feet deep.
I think the backhoe will need to dig too much dirt & will be slower by far....what do you fellas think.??
Any info appreciated.
 

Aussie Nick

Well-Known Member
Joined
Jun 16, 2008
Messages
48
Location
Melbourne...Australia
It will depend on the size of the trencher compared to the size of the back hoe. If it is a decent sized trencher, like on a Dingo, then the trencher might be faster and the trench more consistent in size and dimension. It also depends on the expertise and skill of the operator of each machine.
The up side of the back hoe is that you can use the bucket on the machine to do a better backfill then the trencher can do.
Nice photos Mass X........... You have missed your calling.
 

JimInOz

Senior Member
Joined
Apr 15, 2008
Messages
534
Location
Victoria, Australia
Trencher

Hi Nick,
Just found out we need a 12 inch wide trench.The cable will be 35 MM.
I wonder what size trencher will cut a 12' trench?
I have an old Drott onsite to rip any tuff spots...I'll make a nice long tine for ripping if there are any rocky parts.I don't expext to find bedrock...just hard clay & stones.

I thought those Dingos were just a toy.I can't see how one would have enough mass & power to do trenching in any ground heavier than topsoil.

Jim
 

Aussie Nick

Well-Known Member
Joined
Jun 16, 2008
Messages
48
Location
Melbourne...Australia
Apologies to MassX for hijacking his thread and making it an all Aussie affair:avid.
The Dingo is certainly no toy . It is a serious well built Aussie machine and will easily do what you seem to want to do with it.
I hired one from Coates for approximately four days and used it on steep terrain where the ground was extremely hard and rocky in places. The rock will slow it down somewhat, as to be expected, unless of course you can borrow Mass-X's machine you can expect any machine to slow down in the hard stuff. However the sort of rock that did slow it down was more akin to quartz and granite. I don' think the trench was anywhere as wide as 12 inches but was ample to lay 32 mm polypipe and there was plenty of room left over after that.
The good thing about it was that it was easy to transport on a single axle trailer, inexpensive to hire for two weekends,powerful and fast and would easily dig to one metre if not more.
You need to practice on it a bit before you start the operation and the hydraulics on the wheel drive can be a bit twitchy when you are using the auger at full pace, however one gets better at it as you proceed.
 

pwrstroke6john

Well-Known Member
Joined
Aug 4, 2007
Messages
233
Location
Texas
Hi Nick,
Just found out we need a 12 inch wide trench.The cable will be 35 MM.
I wonder what size trencher will cut a 12' trench?


Jim

If you need a 12inch wide trench you should just get a mini ex, most of the small ride on trenchers will only cut 4-8inch trenches.
 

JimInOz

Senior Member
Joined
Apr 15, 2008
Messages
534
Location
Victoria, Australia
Trencher

Thanks fellas....I'll do a bit of research.I couldn't believe the power Co required a 12'' trench for a 35MM cable & conduit in a rural area.
I'm gonna push them for a reason.

Sorry to MX about hijacking your thread.
Those pics are good ...the scenery is OK too.
 

RonG

Charter Member
Joined
Dec 2, 2003
Messages
1,833
Location
Meriden ct
Occupation
heavy equipment operator
That may be their minimum for backfill around their cable in that area.Ron G
 

jurgcor

Member
Joined
Jun 20, 2008
Messages
12
Location
Manor TX
Occupation
Heavy equip operator/Rock pick
Speaking of mills and trenchers

I worked a job in Austin TX that had the trencor 1860's, with 22' mill heads on short sticks. Mill 800,000cuyd rock talk about big and impressive. 3 ft deep passes in solid rock. Really cool, really sorry I didn't take any pics. P.S. Biggest trenchers in the world so i'm told.
 

AtlasRob

Senior Member
Joined
Feb 8, 2008
Messages
1,982
Location
West Sussex UK
Occupation
owner operator
Wasn't sure if I should put this here or in the "Mills" Forum, so if it's in the wrong place, feel free to move it.

Anyone here operate trenchers or work around them much? I really like working around the machines, especially the new Terrain Leveler that Vermeer has introduced. It's pretty cool to watch a 385C smoke it's teeth across the top of solid rock and then have one of these things come in and saw through it like butter.

This is a Vermeer T1055 with a 16' bar, 32" cutting width, sawing pipe trench. CA Johnson Trenching was the subcontractor we hired to do the trenching. www.cajohnsontrenching.com

Very impressive and great pics Mass-X.
What were you putting in the trench? and dont say pipe :D I ask as there doesnt appear to be much room for access, so I am thinking plastic water !
Cant see it being steel gas as there is no room for sidebooms and that previous corner looks a bit on the sharp side ;)

Will the arisings go straight back in, pre graded or bedding first ?
 

Mass-X

Well-Known Member
Joined
Nov 18, 2006
Messages
167
Location
CA
AtlasRob: "What were you putting in the trench?"

That particular ditch was for sanitary sewer, HDPE pipe.

When I started on that project 345C and 365C’s were being utilized to excavate all the pipe trenches. The machines had to be equipped with pin grabber couplers so they could go back and forth from rippers to 30” buckets. The result was a lot of broken ripper shanks; buckets peeled in half and cracked sticks on machines with less than 2000 hours on them.

They were running 3-4 mainline excavators digging trench to each single pipe crew. Once each operator had enough trench excavated to lay a pipe, he’d call the pipe crew on the radio, they’d come over and set it, then go to the next excavator that was ready. Production was terrible and the material coming out of the trenches ended up being handled several times from excavating to crushing to backfilling.

The municipality allowed us to substitute most of the SDR-35 pipe with HDPE. And in some cases the DIP as well. For sewer pipe the trencher would cut the ditch and at the end of shift I’d pull off one of the D8’s or D9’s to spend the last hour of the day pushing all the spoils back into the ditch until he was caught up with the trencher.

Then, instead of a 345 or 365 having to excavate the pipe trench we’d use a 320C with a 30” deeply heeled bucket to spoil the material back out of the ditch and grade it utilizing a GPS on the machine. Because of the hardness of the rock the spoils coming off the trencher were fine enough that we were allowed to use them as bedding and backfill for any HDPE pipe. So just drag the fused pipe up to the ditch and drop it into the pregraded ditch.

At manholes we’d bring in a 365C or 375L with ripper and excavate the grade for the manhole, vault box, etc. Since the trencher had cut right through the middle of where the manhole would sit it gave the rock somewhere to go and was pretty easy to dig out. Manholes were then placed on grade and the HDPE pipe was attached.

"Cant see it being steel gas as there is no room for sidebooms and that previous corner looks a bit on the sharp side"

That first picture actually has me standing where the spoils were pushed back into the ditch. There is a radius back behind me that originally called for 5 manholes to get through it with the SDR-35 pipe. Due to switching to HDPE we eliminated the need for the manholes (saving money) and the trencher just cut right through and we laid the pipe.

"Will the arisings go straight back in, pre graded or bedding first ?"

Where we were allowed to use HDPE pipe the material coming off the trencher in most places on that project was so fine that it passed the municipalities inspection as bedding. On the SDR-35, DIP and ADS pipes we had to use a ¾” crushed AB for bedding/shading and then used the trencher’s spoils for the remaining backfill.

With pipe that required laborers to get into the ditch, like DIP or storm drain lines we’d cut a trench as shown in the pictures, then push the material back in. Then have the trencher cut a ditch right next to the previous ditch, making for a total 64” wide trench. A 320-330 would then be used to excavate the trench with trench boxes/shoring, place the pipe, etc. It was a tight fit inside the trench box for the pipe layer with that narrow of a ditch but it drastically increased production compared to excavating the native rock and eliminated the double and triple handling of the material.
 

AtlasRob

Senior Member
Joined
Feb 8, 2008
Messages
1,982
Location
West Sussex UK
Occupation
owner operator
Mass-X :notworthy Thank you for a very informative reply. I bet you got some funny looks, smart comments when you proposed back filling the trench before any pipe was in it, but I understand exactly what you mean. What the smart ones call " thinking outside of the box " to change that operation so radically. Credit where its due, well done :drinkup
 

AtlasRob

Senior Member
Joined
Feb 8, 2008
Messages
1,982
Location
West Sussex UK
Occupation
owner operator
That first picture actually has me standing where the spoils were pushed back into the ditch.

Does Mass X mean your invisible and is that why I can't see you standing in the first photo???????????:confused:

No its an old English trick that we tought those boys before we left. They used to stand in front of the camera but it used to obscure the view and all pictures were the same. We showed them how to stand behind the camera, see the result :thumbsup we taught um well and they picked it up a treat.
 

ringer

Member
Joined
Jan 14, 2008
Messages
18
Location
s.d.
what trencher would you use to put in geo thermo heating

i have a 4010 ditch witch max depth is 7 ft need 7ft 6in min. any way i can get more depth market for putting geo in is getting good
 

Aussie Nick

Well-Known Member
Joined
Jun 16, 2008
Messages
48
Location
Melbourne...Australia
I'm A bit worried Rob that Mass X has gone quiet.
I don't think he might appreciate our sense of humour and the prospect of him arriving to say 'Hello" with his trenching machine in close proximity is .....shall we say.... rather daunting.
I dont think I would like to end up as the fines lining one of his sewer pits. Further, it might be difficult to spot him coming given that there is a chance that he is invisible:stirthepot
 