Dirk North
New Member
Hi,
Anybody have any experience or luck implementing Komatsu's IMC with specifically Sewer main installation? Trying to pull grade of .5% with strictly the machine and prep a bunch of trench, but the tolerance of 20-30mm accuracy of the Gps doesn't seem to cut it. Wondering if anybody's had any luck, or if this is something we just have to do the old fashioned way with a pipe laser and pipe layer
Anybody have any experience or luck implementing Komatsu's IMC with specifically Sewer main installation? Trying to pull grade of .5% with strictly the machine and prep a bunch of trench, but the tolerance of 20-30mm accuracy of the Gps doesn't seem to cut it. Wondering if anybody's had any luck, or if this is something we just have to do the old fashioned way with a pipe laser and pipe layer