Have a 1ac pond to do for a guy. Soil will be spoiled/piled in one, central place. The distance between dig site and spoil site will be 500-800ft. IMO, it is too far to be practical to push with a dozer. An ADT would be nice but I don't own one and getting one to the site will probably not be financially feasible. I am torn between 1 dump truck, 2, or possibly a loader operating here. I can see a lot of time wasted with trucks in lifting, dumping, backing, etc.
Curious what you guys might think here? All easy soil to dig.
Curious what you guys might think here? All easy soil to dig.