Again no pic, will post later, I'm exhausted it's high humidity and in the 90s
The good, the Bad and the Ugly
Good - Got the wood for a low cost, and would rather the wood be 1.5 but 2 inch works. Don't have enough 8 footers but have more 16 footers than needed "maybe"
Bad - It took so long for the guy to cut the wood, stuff started warping. So been using all kinds of things to fasten and bend boards into position, then drill and screw. If they are to warped, have ripped the boards straight using chalk line. Bought another carbide saw blade and things are going better
Ugly - Two of the 16 footers are 2.25 thick and don't want to use them, imagine putting one of those in the middle or one side,
. Middle not to bad if loading track or tire vehicle, but place pallet or other will cause issues. Found one that is 1.75 inch thick for first 18 inches, then goes to 2 inch, and I need 188 inch so not enough to use the whole board. Have been working the entire width trying to keeps the boards square, and dang this is hard
Have 27 inch (+/- 0.25) space to fill for 16 footers than go back to 8 footers. Maybe one more day I hope will finish. Could sure use a Industrial planner but that is for another lifetime
The good, the Bad and the Ugly
Good - Got the wood for a low cost, and would rather the wood be 1.5 but 2 inch works. Don't have enough 8 footers but have more 16 footers than needed "maybe"
Bad - It took so long for the guy to cut the wood, stuff started warping. So been using all kinds of things to fasten and bend boards into position, then drill and screw. If they are to warped, have ripped the boards straight using chalk line. Bought another carbide saw blade and things are going better
Ugly - Two of the 16 footers are 2.25 thick and don't want to use them, imagine putting one of those in the middle or one side,
Have 27 inch (+/- 0.25) space to fill for 16 footers than go back to 8 footers. Maybe one more day I hope will finish. Could sure use a Industrial planner but that is for another lifetime