Drsmall
Member
I have a job coming up stacking bin blocks (waste concrete blocks 2x2x6) to retain a bank. I usually lean them back some but always wonder if I'm leaning them too much or not enough. I was wondering what you guys think? I was sort of thinking 2" per block