skyking1
Senior Member
I got it all cut and the lowest 20 feet of the ramp is the soft clay you can drop a digging bar right into. Bad news. I have a scheduling crisis so I will work it tomorrow. The dirt guy on my downtown job donated a couple of 20' pieces of 7.5' fabric. There is water now, so i will pump that out, over ex the bad spot about a foot, fabric, and beat in some 4" to 8" spalls. I'd rather have 6" minus but availability on the weekend is hit or miss. I can give it a little vibe and then top it with the re-used crush rock I stripped off.
I had a load on the truck and proof rolled the top third OK.
I had a load on the truck and proof rolled the top third OK.