A good operator will make it work. It might be necessary to slow down to gain a level of control if the machine design isn't what it should be.A friend of mine has a Case 580K with foot swing. He also has two large Excavators. I use him when replacing road culverts. The guy that runs his Case is very rough on the controls. I wouldn't consider getting in the trench when he's within reach. I always thought he was just a bad operator. Maybe I'm being too hard on him. Maybe he's struggling with the swing controls because of design?? I'll relax my under breath condemnations of him next time.
My friend always runs the Excavators. They are Linkbelt machines. I have no reservations about being around him. I've rode across many, many trenches in his bucket.
I'll illustrate with the antique tractor pull my son hosts on each Columbus day weekend:
I set 800 lb blocks on a steel stone boat. There is a great surplus of "helpers".
A pipe cast into a concrete block weighing 800 lbs receives two pegs hanging from chains. Typically, we move two at a time. Put the pins in, get out of the way. Let the operator place the two 800 lb blocks on the boat, then move in to fine tune placement, and unhook. Each year we have a pre pull lecture: "Stay away from the blocks until they are within a few inches of being placed!"
The proximity of four pairs of hands throughout the 10 foot journey forces the operator to take five minutes to do what would take 10 seconds without "Help". A John Deere hoe could do it in two minutes.