Tiny
Senior Member
Finally talked the boss into digging for pics . Knot head said he moved nearly all the files to home.
Here are 4 photos .
Here are 4 photos .
Did you get to work on that job?
Still think a torch would be a easier ( and cheaper) way to move that bridge. JMO
Realy big things in the Netherlands
AC 500-1SSL Wagenborg Nedlift lifting a Spierings SK 1265-AT6 on the roof of a hospital!!
2x AC 650 Mammoet
2x AC 650 and 2X LTM 1500 to lift 2 bridges with a weigth of 500 ton each.
LTM 11200-9.1 and LR 1350-1 lifting a offshore platform of over a 250 tons.
And the biggest lift i'f seen in my life is this cranepart of 2600 tons at the headquarter of Mammoet in Schiedam!
Thursday it was another KTU job,Difference is this time is the 777 way sent to McPherson Kansas to a refinery.Instead a rental company rented a crane from another rental company. Makes perfect sense :beatsme
Anyway their setup man was having a bad day.Rained the day before and if you left the hard pack you were stuck. Think the 1st pic was the 2cd time stuck.
Also the strap used was his as we are banned from using straps after they are used to pull like that.
Then the carbody jacks use a separate set of lines hooked to the house.Works good but you can't swing 360 as you can see.Tore the lines off.
Also just before the lines wear fubared for some reason it was jacked up to the max.Then with the lines broke there was no way to bring it back down.In my opinion a bad idea to attempt the tracks but the set up guy didn't seemed worried.
Also I did Not like the blocking under the carbody outrigger pads.