Yes, I am using 3 heads there but only one power pack to drive them. The way I did them was to get a set up welding and while that was happening I'd be setting up the next bores. When the welder had finished all I had to do was swap over the hydraulic hose (30 seconds) and start the welding or machining again. The gear I use does the welding and machining in the one set up so it allows quick pre machining before welding.Am I seeing things or are you running 3 machines at once?
Yes, I am using 3 heads there but only one power pack to drive them. The way I did them was to get a set up welding and while that was happening I'd be setting up the next bores. When the welder had finished all I had to do was swap over the hydraulic hose (30 seconds) and start the welding or machining again. The gear I use does the welding and machining in the one set up so it allows quick pre machining before welding.
Those jobs as I said aren't my favorite so my plan is to get in and out as quick as possible. If I put a bit of pressure on myself I can do one of those in 10 hours.