Gents,
I've seen you guys in the USA use pipe bedding skips on pipelines, i assume to stop wasting materials.
We have been using skips for concrete however are considering fabricating something simialar for pipe bedding, which can be pulled along.
We would be using them with 13 and 20 tonne machines.
What size?
What hieght?
Do / can you tip trucks into them or feed via loader?
What thickness of materials are they made from?
Design?
Anything else i need to know??
Thanks