This will be the biggest demo I have done (if I get the job) It is 2 story brick home, approximately 45'x85'. The first floor has tile throughout, 2nd is hardwood. All drywall on walls and ceiling. Slab in garage of course. metal roof. dirt crawl. one chimney. Hardest part is going to be making sure that all the material falls to the front, there is a cliff on the backside and if it falls over the cliff my butt will be in trouble!!!
How much tonage is there here? How much of that is brick, concrete? and how much is wood, drywall.
Hrs to sort through and separate brick, wood, metal/wire/copper with excavator?
I have a 160 and a mini ex with hyd thumbs to work with.
Also, any advice on how to ensure that it falls all to one direction?
Thanks in advance...great forum here!
How much tonage is there here? How much of that is brick, concrete? and how much is wood, drywall.
Hrs to sort through and separate brick, wood, metal/wire/copper with excavator?
I have a 160 and a mini ex with hyd thumbs to work with.
Also, any advice on how to ensure that it falls all to one direction?
Thanks in advance...great forum here!