the pipeline cleaned up pretty good. we spent about seven days on it.
we used the wished y2000. we didn't break anything on the disk although we did adjust it a couple of times.
we did shake the muffle apart on the cat 75c challenger we were using as well as had a frost chunk jump up and break a filter housing.
i am please with the way it turned out. with the way that this ground was saturated and boggy the cat dropped through a couple of times and we had to have a helper dozer with it to pull it out. i don't think we would have gotten this accomplished even in the hottest part of the summer because i don't think that this ground is ever going to dry out or get solid.
we used the wished y2000. we didn't break anything on the disk although we did adjust it a couple of times.
we did shake the muffle apart on the cat 75c challenger we were using as well as had a frost chunk jump up and break a filter housing.
i am please with the way it turned out. with the way that this ground was saturated and boggy the cat dropped through a couple of times and we had to have a helper dozer with it to pull it out. i don't think we would have gotten this accomplished even in the hottest part of the summer because i don't think that this ground is ever going to dry out or get solid.