• Thank you for visiting HeavyEquipmentForums.com! Our objective is to provide industry professionals a place to gather to exchange questions, answers and ideas. We welcome you to register using the "Register" icon at the top of the page. We'd appreciate any help you can offer in spreading the word of our new site. The more members that join, the bigger resource for all to enjoy. Thank you!

Work Pics

e4cranes

New Member
Joined
Aug 22, 2012
Messages
3
Location
South florida
The crane is an LTM1400-7.1. All LIEBHERR cranes have very detailed reeving plans in the Operators Manuals. There should never be any guess work involved because you should never deviate from the reeving plans, ever.
 

dbl612

Well-Known Member
Joined
Jul 6, 2012
Messages
111
Location
torrington, ct.
Occupation
crane operator
most euro and japanese machines have lagging that is machined to work best with metric sized wire rope. american machines historically have had lagging that was set up for imperial measurements, (5/8,3/4,7/8,1,etc) each works best when used with what it was designed for, although metric sizing has become more prevalent. (all started years back with tower cranes from europe with their high-performance, compacted strand rope).
 

e4cranes

New Member
Joined
Aug 22, 2012
Messages
3
Location
South florida
most euro and japanese machines have lagging that is machined to work best with metric sized wire rope. american machines historically have had lagging that was set up for imperial measurements, (5/8,3/4,7/8,1,etc) each works best when used with what it was designed for, although metric sizing has become more prevalent. (all started years back with tower cranes from europe with their high-performance, compacted strand rope).

What I should have said in reference to the "drum" being Euro or US spec was that LIEBHERR (or any of the European machines) would not deviate from their metric specifications to pacify us in America. If a rental company uses a rope that is fractional in size to replace an O.E. rope then they will have to deal with it. In my experience if the rope is winding with gaps between wraps it sometimes is the end where the lagging kicks the rope over, that area could have a dimensional mistake from its manufacture.
 

zeeklu

Active Member
Joined
Jul 15, 2012
Messages
27
Location
NJ
It was a standard drum. Not U.S. verses European. It was the cable that was different. It was factory U.S. spec cable. Chris
 