I contacted a place a while back who was offering a wiring harness for the 40F. They told me there were two lengths. It’s either 65 feet or 80 feet, depending on the valves used. I asked her if I could email her a picture of the valves and maybe someone there could tell me. She said that know one there would know and suggested I go for the longer length to be safe, but @ 16.00 per foot that extra 15 feet is 140.00. Luckily I found some cable for 10.00 less.
It seems that the more time I spend working on this thing the easer it all starts to look. No computer, it’s all just hardwired. If I could just get the boom rewired and re lined, I’d then know where I’d stand with this thing. Every time I start it up it’s got another new problem. The latest is it only moves in reverse. I switched controllers and it still does the same thing. Maybe it’s a broken wire or ground who knows? There are so many exposed wires under there. I thought if I start with the electrical which I know is a mess maybe it’ll end there. If not I’d know where to go next. A kind of reverse engineering. The great thing about this unit is its simplicity, and it’s built to last another 30 yrs. The more you two guys talk the more I see and hear. It’s pretty cool. I think it’s an excellent way to learn. I really appreciate your input.