I have to give an estimate soon a house on the beach in NJ. The house is about 140' x 50' with a basment (9' deep). I estimated 1,325 cy yard s have to come out of the basment and 75 cy out of the rest of the footings. So a total of 1,400 cy of fill have to be excavated and removed. Monday i will be calling around for pricing on trucks and to see were I can get rid of the fill. I need help with the time to excavte, load trucks and backfill. The back of the house is only 5' of the property line so I was think I can ramp down and bring the 160 in the basement or I can lower my skid steer in with the 160 to do the backfill and stone the basement. Alos there will be 6 1,000 gal seepage pits to be installed and all the 4" drainage pipe for the roof drains.