Hi all I am installing the conversion kit on my 120-2 and have most of it together. The installation manual consisted of 3 pictures/ diagrams. I found more on this site which helped a lot The only pic of hose going to valve bank was for a 200 and is different . Can anyone tell me where it connects on a 120-2?
Also the new plate for the bottom of the pump is basically a blank cover am I missing anything there is a resesed hole that looks like something should go there?
Any help is appreciated .
Kevin
Also the new plate for the bottom of the pump is basically a blank cover am I missing anything there is a resesed hole that looks like something should go there?
Any help is appreciated .
Kevin