the mud slide we are cleaning up on this job is 500-600 feet wide and in places it is 30-40 feet thick. we are in a town called Oakridge Oregon the high temp today was 20 with about a 30 mph wind.
we were call on saturday after noon to come help the rail road with this, it then took the next 30 hours to plow the 6-8 feet of snow off 5 miles of logging road to get to the edge of the slide. we were using a d8h, d5c and a 140g grader to clear snow.
today i started into the mud and tree mess, worked 10 hurs and made it 40 feet.so it sounds like we are going to be here a while.
equipment list
excavators
3 330
2 450
1 318 rubber tire with rail road wheels
1 210 rubber tire with rail road wheels
cats
1 d9g
1 d8h
1 d5c
1 650 john deere
graders
2 140g
loaders
1 988a
1 983b
trucks
2 kw tractors with lowboy trailers on stand by
here are the pics i have so far
http://www.budandraven.com/gallery/main.php?g2_itemId=2496
more pics on my web site and lots more to come
we were call on saturday after noon to come help the rail road with this, it then took the next 30 hours to plow the 6-8 feet of snow off 5 miles of logging road to get to the edge of the slide. we were using a d8h, d5c and a 140g grader to clear snow.
today i started into the mud and tree mess, worked 10 hurs and made it 40 feet.so it sounds like we are going to be here a while.
equipment list
excavators
3 330
2 450
1 318 rubber tire with rail road wheels
1 210 rubber tire with rail road wheels
cats
1 d9g
1 d8h
1 d5c
1 650 john deere
graders
2 140g
loaders
1 988a
1 983b
trucks
2 kw tractors with lowboy trailers on stand by
here are the pics i have so far
http://www.budandraven.com/gallery/main.php?g2_itemId=2496