I have a question about Bid Bonding. On this job I'm bidding there is an item in the Bid Tab for Bond 1 L.S. And the engineer said 100% bid bond. I was wondering what % of my bid I would put in there for that. Can someone just give me an example of a percentage that a bonding agent charges the contractor?
I have a question about Bid Bonding. On this job I'm bidding there is an item in the Bid Tab for Bond 1 L.S. And the engineer said 100% bid bond. I was wondering what % of my bid I would put in there for that. Can someone just give me an example of a percentage that a bonding agent charges the contractor?