• Thank you for visiting HeavyEquipmentForums.com! Our objective is to provide industry professionals a place to gather to exchange questions, answers and ideas. We welcome you to register using the "Register" icon at the top of the page. We'd appreciate any help you can offer in spreading the word of our new site. The more members that join, the bigger resource for all to enjoy. Thank you!

Search results

  1. C

    Deere 250G Pattern Changer

    we have an aftermarket pattern changer we are putting on a Deere 250G but having trouble finding the proper hoses to hook to it. Does anybody have a schematic of diagram of the pilot lines? The lines are all lettered at the valve block but haven't been able to find anything that tells me what...
  2. C

    Boom won't lift

    It's a 98. Sorry just saw your reply
  3. C

    Boom won't lift

    Should mention to that the boom drifts off pretty bad too when warm
  4. C

    Boom won't lift

    The seals were bad on cylinder & the barrel was scored so by the time it was repaired wasn't much more to just buy new. Thanks for the idea on testing pilot system. I will have to give that a try
  5. C

    Boom won't lift

    we have a Timberjack 608 track feller buncher, which I could of posted this in the forestry section but a feller bunch has the same operation as an excavator, from time to time the main boom cylinder will not raise. It will lower but pulling on the joystick it will not raise the boom then in 10...
  6. C

    For sale: Link Belt Long Reach Excavator

    For sale: 94 Link Belt LS3400 Series II long reach excavator. Machine has 60 ft of reach. Isuzu 6 cylinder engine. Runs & starts great. Good undercarriage. 32" pads. Comes with a like new TAG .8 cy ditching bucket with bolt on reversible cutting edge. No cracks or welds on boom or stick. Machine...
  7. C

    Deere 270DLC pin size

    Great! My only other dilemma is then that the distance from the main boom pin to where the cylinders attach on the boom. On the original boom it measures 105" but the long reach boom measures 98 3/8". In your opinion do you see any issues with this?
  8. C

    Deere 270DLC pin size

    I am needing to find out the main boom pin diameter on a Deere 270DLC excavator. We are looking at buying one & already have a long reach boom we are thinking of Swapping onto it but want to make sure it's the same pin size. Called dealer & part number doesn't say the size. Any info would be...
  9. C

    Track tension adjuster question

    Never heard of those. I appreciate it
  10. C

    Track tension adjuster question

    I recently bought a new machine(new to me) & I do not know how to tighten the tracks. I am used to just using a grease fitting to adjust tracks but this machine has something different. Check out the picture I included. Any info on what this fitting is would be very beneficial as the tracks need...
  11. C

    Demo debris recycling

    Have you ever used a multi processor on your excavator? I was just curious on how well they worked on separating the rebar from the concrete. If I can get the rebar & most of the wwf out of the concrete I can do something with it besides just taking to the landfill which is why I thought a...
  12. C

    Demo debris recycling

    Just trying to figure out if I can take some off our bids when we know there's a fair amount of steel & if all the wiring is still in the structure the copper.
  13. C

    Building demo

    Yah we've got a few residential demos already lined up to do & a few other possible demo bidding opportunities coming up in the next few weeks. Maybe even a possible hotel demo which is why on another thread I started wanting to find out about recycling concrete to keep the hauling to the...
  14. C

    Demo debris recycling

    Well our plan was to crush on site to save on trucking. With clean concrete we can fill ravines & that kind of thing but painted concrete they really frown upon so was trying to figure out a way to not take it to the landfill. Landfill costs here are $32/ton plus the land fill is nearly a 2.5...
  15. C

    Demo debris recycling

    With the high rates of landfill dumping is anybody doing much recycling of demo debris to keep your cost & bids down? Mainly referring to more commercial structure than residential. I know there is descent money in scraping steel & the copper wire if its still there but what about all the...
  16. C

    Building demo

    We did not get to do this project. Had a guy low ball it thats in good with certain ppl. He did the entire project demo, haul off, & filled in the basement for less than I could even knock the thing down. Hard to compete w/ ppl like that.
  17. C

    excavator-feller buncher head

    It works really great actually. One of these days I would like to get a power pack(extra engine & pump just for the cutter head). It's a little slow at times on excavator functions but for the most part the hydraulics keep up. Mine has 2 sets of grapples & to help with keepin enough hydraulic...
  18. C

    Building demo

    Vincennes
  19. C

    Building demo

    Yep all concrete. Floors are concrete as well. It used to be a TB hospital
  20. C

    Building demo

    The building is 125ft x 44ft x approx. 40ft tall has a full basement 10ft deep. All exterior walls are 1ft thick concrete w/ brick veneer & all interior walls are concrete as well approx. 6in thick. Has concrete sidewalks on 3 sides & a concrete ramp. Has elevator inside. Basement walls taken...