• Thank you for visiting HeavyEquipmentForums.com! Our objective is to provide industry professionals a place to gather to exchange questions, answers and ideas. We welcome you to register using the "Register" icon at the top of the page. We'd appreciate any help you can offer in spreading the word of our new site. The more members that join, the bigger resource for all to enjoy. Thank you!

Cutting windmill blades

DMiller

Senior Member
Joined
Feb 21, 2010
Messages
16,557
Location
Hermann, Missouri
Occupation
Cheap "old" Geezer
The only aspect the recyclers ever arrive at is Mix with Concrete, is fine until have to break it out or drill it then release the dust again, even worse to remove aged FBGLS reinforced concrete as full of hail and as dries out or degrades releases the hairs.
 

mudnducs

Well-Known Member
Joined
May 14, 2014
Messages
63
Location
Jonesborough, Tennessee
Occupation
retired mech eng
1)You might talk to the OEM (blade manufacturer) and ask them how they would part them into sections.
2)The engineering staff of the company that's tearing these units out may also have some ideas on destroying them.
3)Ship yards use some very high pressure water blasting equipment that should cut the glass.

2 cents
 

KSSS

Senior Member
Joined
Feb 27, 2005
Messages
4,333
Location
Idaho
Occupation
excavation
I didn't take the job and I never found out what they did about moving them. I would like an opportunity to try different methods out and see what would work. I would not entertain doing it manually.
 

Plebeian

Senior Member
Joined
Apr 2, 2009
Messages
434
Location
NZ
New recyclable wind turbine blade technology hopefully will be successful.

 

DMiller

Senior Member
Joined
Feb 21, 2010
Messages
16,557
Location
Hermann, Missouri
Occupation
Cheap "old" Geezer
I wish the recyclers well but there is only so much need for concrete additive or as a filler in concrete and that is currently all this stuff is used for. The cement maker at Hannibal MO is incorporating Some of this stuff after it is ground up at a Louisiana MO facility as a fuel(Coal) stretcher and a kilned additive while the process runs for cement.
They have had EPA issued responses to Silica levels in air around the facility.

Primarily it is being burned.
 

joe--h

Senior Member
Joined
Jul 22, 2009
Messages
1,259
Location
Utah
Ran across this
burying-wind-turbine-blades.jpg

Doesn't look to ecologically sensitive to me.
Joe H
 

crane operator

Senior Member
Joined
Mar 27, 2009
Messages
8,315
Location
sw missouri
Ran across this
burying-wind-turbine-blades.jpg

Doesn't look to ecologically sensitive to me.

I at first thought that picture had a guy with one of those mexican straw hats, sitting on a magnatrac mini dozer from the back of popular mechanics, and thought "he's going to be there forever".

Then I saw the tires off to the right and got a better sense of the scale and realized it was like a D10 or something. Great picture though.
 

Willie B

Senior Member
Joined
Jan 2, 2016
Messages
4,060
Location
Mount Tabor VT
Occupation
Electrician
We smash everything with the biggest, hardest boulder we can lift. pick it up with bucket & thumb, lift as high as you can, drop it on the blade.
I'd expect a lot of splintery debris to be produced, but not much dust.
I do electrical work where they build those blades. they don't take a lot of precautions about dust sanding them.
 

hosspuller

Senior Member
Joined
Aug 27, 2014
Messages
1,872
Location
North Carolina
they are inert, so i don't see an ecological problem there. We doze under a lot nastier stuff in landfills.

It's the hypocrisy of promoting, nay.. requiring wind turbines for "Ecological protection"

My electric bill has a "renewable energy surcharge" every month. Means utility has to buy such energy at higher prices than they can generate electricity for. It's mandated by the state of NC.
 

DMiller

Senior Member
Joined
Feb 21, 2010
Messages
16,557
Location
Hermann, Missouri
Occupation
Cheap "old" Geezer
Problems there as creates excess dust, Silica issues, similar to Asbestos where causes lung damage, Silicosis. Would have to be done continually wetted or EPA and OSHA have field day.
 

CM1995

Administrator
Joined
Jan 21, 2007
Messages
13,344
Location
Alabama
Occupation
Running what I brung and taking what I win
Problems there as creates excess dust, Silica issues, similar to Asbestos where causes lung damage, Silicosis. Would have to be done continually wetted or EPA and OSHA have field day.

MOD EDIT - DM I banned the saw blade spammer so it leaves this post with no reference just so everyone else knows. CM
 
Top