• Thank you for visiting HeavyEquipmentForums.com! Our objective is to provide industry professionals a place to gather to exchange questions, answers and ideas. We welcome you to register using the "Register" icon at the top of the page. We'd appreciate any help you can offer in spreading the word of our new site. The more members that join, the bigger resource for all to enjoy. Thank you!

What is the one type of machine that you just hate repairing.........

old-iron-habit

Senior Member
Joined
Nov 22, 2012
Messages
4,233
Location
Moose Lake, MN
Occupation
Retired Cons't. Supt./Hospitals
Not a traditional construction machine, but it makes building construction machines possible. One time when home for a few days between projects, I volunteered to work with my tools on a short term taconite plant shutdown when the company was short of manpower. To show them I was just one of the guys and not afraid of doing a sh*ty job, I took two young guys and we tackled changing out the grating in the shakers. It took a crawl of 60 feet up the angled enclosed chute to get in to them, dragging each 2' X 2' square 4" thick grates in by hand and rope and sliding the 1-1/2" thick worn ones back out. All day pinching the toes into the walls to keep from sliding around. I could hardly walk after two long days, but we got them done in ahead of average time. I could have probably passed for a minority for the two weeks it took to wear that taconite off.
 

HardRockNM

Well-Known Member
Joined
Jan 14, 2020
Messages
105
Location
New Mexico
Occupation
Miner
Not a traditional construction machine, but it makes building construction machines possible. One time when home for a few days between projects, I volunteered to work with my tools on a short term taconite plant shutdown when the company was short of manpower. To show them I was just one of the guys and not afraid of doing a sh*ty job, I took two young guys and we tackled changing out the grating in the shakers. It took a crawl of 60 feet up the angled enclosed chute to get in to them, dragging each 2' X 2' square 4" thick grates in by hand and rope and sliding the 1-1/2" thick worn ones back out. All day pinching the toes into the walls to keep from sliding around. I could hardly walk after two long days, but we got them done in ahead of average time. I could have probably passed for a minority for the two weeks it took to wear that taconite off.

That'll do it. I really do not care for working on screens, especially those that rely on side clamping rails to align the screen cloth and put it in tension. Cramped, sharp, loud, often wet, and even more fun if there's enough of a drop out of the discharge end that fall protection is required.
 
Top