Watched two old men years ago, one surveyed and set up sights, the two drove the haul equipment to site set up the D7(17A) and 955k first guy went to next site and second guy ran the dozer first cleared to piles, used 955k for close in work and when needed materials set to dump trucks. Was faster than a man strictly on either but had been doing it that way forever.