DMiller
Senior Member
Well have decreased the projects list considerably, down to the landscaping and mowing with cleaning out the excess crap in the workshop.
Headed to OKLA this Friday, get the KW Picked clean and ready to load for JY, then haul a wad of little stuff back to the house. Next week will be nothing but cleaning and storing to organize enough to get the wagon pushed in head end out and start my end of it.
First Estimate is in for C15 Overhaul and Head, is incomplete but tallied $7450 +/-, have a second fella setting up a quote for all on the list he can obtain thru IDP, will see as that comes in. Final say as to needs is cleanup of all the already removed materials then strip the pistons and sleeves inspect the block deck, time to drag out the old straight edge after scrub the deck clean.
Headed to OKLA this Friday, get the KW Picked clean and ready to load for JY, then haul a wad of little stuff back to the house. Next week will be nothing but cleaning and storing to organize enough to get the wagon pushed in head end out and start my end of it.
First Estimate is in for C15 Overhaul and Head, is incomplete but tallied $7450 +/-, have a second fella setting up a quote for all on the list he can obtain thru IDP, will see as that comes in. Final say as to needs is cleanup of all the already removed materials then strip the pistons and sleeves inspect the block deck, time to drag out the old straight edge after scrub the deck clean.