blucllrplt
Member
Haven't worked much over the past couple of weeks so decided to make something in the shop. Its been very windy here lately so decided to make some weathervanes of the equipment that I have. Need to get a little more metal before I can mount the dozer cutout. I machined both ends of a 1"pipe to accept a 1" OD x 1/2" ID bearing so they spin freely in the wind.