• Thank you for visiting HeavyEquipmentForums.com! Our objective is to provide industry professionals a place to gather to exchange questions, answers and ideas. We welcome you to register using the "Register" icon at the top of the page. We'd appreciate any help you can offer in spreading the word of our new site. The more members that join, the bigger resource for all to enjoy. Thank you!

shortening well on lowboy??

chris dials

Active Member
Joined
Apr 15, 2017
Messages
25
Location
oregon
ive got a 60 ton lowboy thats got a 26 foot well....has anyone ever shortened a lowboy? can it be done? should it be done?

done some researching and dont want to take a major loss selling this thing, and i need a 20 foot well. cant seem to find any used lowboys in this tonnage with a 20 foot well, and new they are 200k +++
just looking for some opinions on it or if itsbeen done?
 

catman13

Senior Member
Joined
Aug 22, 2011
Messages
435
Location
oregon usa
Occupation
refrigeration engineer/excavation contractor
you may run into bridge law issues shortening it that much 60 tons.
a picture may help get a better answer
 

chris dials

Active Member
Joined
Apr 15, 2017
Messages
25
Location
oregon
I’ll get some pictures tomorrow.
Most all my hauling is in the woods and that long well gets me fouled up probably 25% of the time. I’m not too concerned about bridge as far as legality on the highway. General makes a 85 ton 20 foot well trailer but needs Jeep and booster for just about any moves on highway.

I was looking at it and it looks like it would be pretty easy to cut the front section (ramps and connection point) off where it’s welded to the beams. Cut out the 6 feet of deck and re attach and possibly add a very short sleeve. Obviously I’d have a good gab shop do the work.
 

AzIron

Senior Member
Joined
Jun 14, 2016
Messages
1,541
Location
Az
You would probably have a harder time getting a fab shop to do it than you think for liability reasons

Anything is doable I think you looking at it the way it's the least impact on structure in theory the trailer should be stronger shorter but without looking at it it can be anyone's guess
 

92U 3406

Senior Member
Joined
Jan 3, 2017
Messages
3,099
Location
Western Canuckistan
Occupation
Wrench Bender
I'm a member on another site and a few HH guys on there have had their trailer lengths increased to better suit their applications. IIRC they had it analyzed by engineers and everything was modified according to the engineered drawings.
 

Truck Shop

Senior Member
Joined
Dec 7, 2015
Messages
16,548
Location
WWW.
Not a big deal, If it has a detachable neck. You would revamp the front to make the well shorter, lots of metal there to work with. But personally I would go no shorter than a 22, IMO.
 
  • Like
Reactions: DB2

RZucker

Senior Member
Joined
Jul 7, 2013
Messages
4,077
Location
Wherever I end up
Occupation
Mechanic/welder
Not a big deal, If it has a detachable neck. You would revamp the front to make the well shorter, lots of metal there to work with. But personally I would go no shorter than a 22, IMO.

Honestly, I would cut it out of the center, some fish plating and cap plates on the beams would be easier than doing the front of an RGN. Plus you can add some arch back into it.
 

Truck Shop

Senior Member
Joined
Dec 7, 2015
Messages
16,548
Location
WWW.
I don't know it's easier to break a pencil in the center that trying to break one inch off the end. Besides who needs easy all the time.
 

Truck Shop

Senior Member
Joined
Dec 7, 2015
Messages
16,548
Location
WWW.
So have I, they were outside frame trailers which makes it easy because of the depth of frame in the center. But they weren't going to be used like a lowboy either. Lowboys never get grossly
overloaded. Just say'in
 

RZucker

Senior Member
Joined
Jul 7, 2013
Messages
4,077
Location
Wherever I end up
Occupation
Mechanic/welder
So have I, they were outside frame trailers which makes it easy because of the depth of frame in the center. But they weren't going to be used like a lowboy either. Lowboys never get grossly
overloaded. Just say'in

Well, i was just sayin' too. I've seen a couple of lowboys that had a few feet added in the center using fishplates and caps on the lower flange of the beams. Whether those had an engineer's blessing i don't know. But they were still working.
 

suladas

Senior Member
Joined
Jun 30, 2016
Messages
1,731
Location
Canada
One thing i'd consider is how long do you plan to keep it? If you plan to sell you got to consider the potential reduced resale due to cutting it apart. Even if it's done right and you got paperwork from a engineer I believe it will scare away a certain amount of buyers if they can see the work that was done. IMO a modification of cutting off the front so that no one would be able to tell would be better. I know if I was at an auction and seen a trailer welded in the middle I wouldn't even look if it was done proper, i'd be running from it too quickly.
 

RZucker

Senior Member
Joined
Jul 7, 2013
Messages
4,077
Location
Wherever I end up
Occupation
Mechanic/welder
Just so happens I was contacted this morning about building a custom lowboy (fixed neck, rear load) on an existing set of rails and axles, not sure what it all looks like, but I'll get to see it this week. Shortening it up was mentioned.
It will be handling a 721 Case loader and a D-5H dozer with a ripper.
 
Top