• Thank you for visiting HeavyEquipmentForums.com! Our objective is to provide industry professionals a place to gather to exchange questions, answers and ideas. We welcome you to register using the "Register" icon at the top of the page. We'd appreciate any help you can offer in spreading the word of our new site. The more members that join, the bigger resource for all to enjoy. Thank you!

Site preparation

1930

Well-Known Member
Joined
Jan 27, 2019
Messages
69
Location
Brandon/Ocala
Can someone here tell me what is a typical drop in elevation 50 ft or 100 ft from house pad?

Water drainage isnt much of a concern. W. Central florida sand. Very loamy
Thanks
 
Last edited:

redneckracin

Senior Member
Joined
May 19, 2010
Messages
574
Location
Western PA
Occupation
Civil Engineer
100 to 50 ft? I am guessing you mean horizontal distance with that, but as long as water can get away from the house there isn't really a set distance. If you can get the footer drains to work by gravity you are in great shape.
 

Ronsii

Senior Member
Joined
Jun 26, 2011
Messages
3,464
Location
Western Washington
Occupation
s/e Heavy equipment operator
I don't know that there is a 'typical' elevation change???? every site is different... all depends on the area... if you're building on hills you might have 20-200 foot change if you out on the flats it won't be an inch...
 

Ronsii

Senior Member
Joined
Jun 26, 2011
Messages
3,464
Location
Western Washington
Occupation
s/e Heavy equipment operator
Well around here code dictates 2 percent at 10 feet... but after that it's what you make it ;) gets real tricky when you're putting in houses with 10 feet between them :eek:
 

CM1995

Administrator
Joined
Jan 21, 2007
Messages
13,373
Location
Alabama
Occupation
Running what I brung and taking what I win
What kind of foundation for the house - monolithic slab on grade? If so You'll need 6" below FFE or the siding to the ground then slope away.

If you are worried about drainage it's always prudent to raise the building pad a few feet from the surrounding area then you have more leverage in the final grading.

In another life when I built houses, I always made sure the building pad was at least 1' above curb on a 60' wide lot.
 
Top