Anyone add power to the cushion cylinders of their 20 ton tilt trailers to allow loading of 2 pieces of equipment?
Thers 2 ways to do this. 1, load the first piece & stop just before it tilts. Load the 2nd piece as close to the 1st as possible. Move the 1st till the bed tilts, then lock the bed. Easier with 2 people. The other way is to load the 1st piece & stop just before it tilts, then block the bed from dropping then continue up til you have room for the second piece. I preferred the 1st method.Anyone add power to the cushion cylinders of their 20 ton tilt trailers to allow loading of 2 pieces of equipment?