• Thank you for visiting HeavyEquipmentForums.com! Our objective is to provide industry professionals a place to gather to exchange questions, answers and ideas. We welcome you to register using the "Register" icon at the top of the page. We'd appreciate any help you can offer in spreading the word of our new site. The more members that join, the bigger resource for all to enjoy. Thank you!

Cabel laying dozers

prfire20

Member
Joined
Dec 18, 2009
Messages
24
Location
MN
Occupation
construction
pretty impresive you would think with that much power if they did hit something underground something would break like the implement wonder how many miles they would drive before they knew it was missing haha
 

watglen

Senior Member
Joined
Apr 3, 2009
Messages
1,324
Location
Dunnville, Ontario, Canada
Occupation
Farmer, drainage and excavating contractor, Farm d
I wonder if the reason they where using that much power to pull was because the pipe is actually feeding into the trench at the end and they're dragging the pipe down the trench as they go.

i suppose you could, buy why would you want to? It is pretty simple to lay the pipe or hose or whatever on the ground and just feed it in as you go.

Unless the line is steel pipe?

They could be just pre-ripping the path the intend to travel, plowing the pipe in on another pass?

I'm stumped :beatsme
 

AtlasRob

Senior Member
Joined
Feb 8, 2008
Messages
1,982
Location
West Sussex UK
Occupation
owner operator
I wonder if the reason they where using that much power to pull was because the pipe is actually feeding into the trench at the end and they're dragging the pipe down the trench as they go.

A possibility but having tried pulling a length of cable through a duct a few weeks back I would not recommend it, way too much drag :D

They could be just pre-ripping the path the intend to travel, plowing the pipe in on another pass?

I took it that was what was happening. I was being a bit of a smart*** with my original comment about forgetting the pipe.

Be honest, if you were going to the trouble and effort to pull a stunt ( in the best possible meaning of the expression ) like that. Would you really want to risk damaging whatever it was you were installing.
I would go for a proof pass then drop back and plow in the pipe / cable.
Apart from the fact that they may not have another set of equipment available to handle the pipe / cable.
 

Construct'O

Senior Member
Joined
Feb 18, 2007
Messages
928
Location
SW Iowa
Occupation
Dozerwork,tiling plus many more!!!!!!!
This isn't dozers,but they are using a drainage tile plow.Installing drainage tile.Frost in the ground when they was doing this.

Also couple plow at a field day i went too this summer.:usa
 

Attachments

  • downsized951222091122.jpg
    downsized951222091122.jpg
    54.8 KB · Views: 1,744
  • STX500_Waynes.jpg
    STX500_Waynes.jpg
    60 KB · Views: 1,694
  • trencher pix 209.JPG
    trencher pix 209.JPG
    47.6 KB · Views: 2,008

JimInOz

Senior Member
Joined
Apr 15, 2008
Messages
511
Location
Victoria, Australia
Looking at the 8N in the first picture,I was wondering about wear factors on tractor & undercarriage.The ripper/plow is sitting a long way back,so the leverage factors must be big ,when ripping in tough ground.
Would cable-layer dozers be set up differently,to suit the work, in a similar way a Steel-Mill or Landfill dozer might be set up?
Any thoughts ?...

Jim
 
Top