croweater
Member
Hi,
I just got a job come in that needs about 3000 metres of 19mm (3/4") poly laid at about 100mm (4") deep thru lawn and sand. I have a large vermeer trencher but seems an overkill for such a small trench. Has anyone any experience with the attachments call a poly pipe layer which looks to be a single tyne ripper with some sort of system for feeding poly pipe to the bottom of the cut. Dingo sell them, not sure who else. I have a Thomas 35gt or a BC 763 which I can attach too.
Cheers
Bruce
I just got a job come in that needs about 3000 metres of 19mm (3/4") poly laid at about 100mm (4") deep thru lawn and sand. I have a large vermeer trencher but seems an overkill for such a small trench. Has anyone any experience with the attachments call a poly pipe layer which looks to be a single tyne ripper with some sort of system for feeding poly pipe to the bottom of the cut. Dingo sell them, not sure who else. I have a Thomas 35gt or a BC 763 which I can attach too.
Cheers
Bruce