Good morning.
Over here in the UK I’ve worked with plenty of scrapers over the years,but although I’ve driven TS24’s with p/p equipment fitted,I’ve never actually used it.
Over here,it’s allways a push load operation,however there are now a few scrapers here with the p/p set up in use.
Obviously you need a longer dig,and I’m guessing that’s why only 2 work in tandem rather than 3 In triple.
Does triple loading cause unnecessary stress on the scrapers,or are they ok?
I’m new to push pulling but would like the opinions of you chaps across the pond who have plenty of experience in this matter.
Many thanks in advance.
Over here in the UK I’ve worked with plenty of scrapers over the years,but although I’ve driven TS24’s with p/p equipment fitted,I’ve never actually used it.
Over here,it’s allways a push load operation,however there are now a few scrapers here with the p/p set up in use.
Obviously you need a longer dig,and I’m guessing that’s why only 2 work in tandem rather than 3 In triple.
Does triple loading cause unnecessary stress on the scrapers,or are they ok?
I’m new to push pulling but would like the opinions of you chaps across the pond who have plenty of experience in this matter.
Many thanks in advance.