• Thank you for visiting HeavyEquipmentForums.com! Our objective is to provide industry professionals a place to gather to exchange questions, answers and ideas. We welcome you to register using the "Register" icon at the top of the page. We'd appreciate any help you can offer in spreading the word of our new site. The more members that join, the bigger resource for all to enjoy. Thank you!

WHAT SIZE?!?!? Ex do I need in my life

firchk

Member
Joined
May 18, 2022
Messages
9
Location
Texas
New to the forum (thanks to the folks that have helped me out so far) bought a machine based off some of the conversation (cat313gc)

now shopping for another - we will be running a bulkhead unloading a hopper barge filled with swamp mud the reach needs to be approx 30~35 from center on mats to far corner of barge

help me pic guys we are Cat fans
 

Plebeian

Senior Member
Joined
Apr 2, 2009
Messages
434
Location
NZ
Unloading barges from a dock is different to digging holes for a pipeline etc.
Machines designed for portside etc use include
Sennebogen-North America, North Carolina. https://sennebogen-na.com/ (For some machines - Cummins diesel or electric motor, 4 different rubber tire bases, 3 different track bases and a fixed base, 6 different boom /stick sets etc are offered)
E-Crane International, Ohio.

Excavator base conversion companies (adding high rise cabs, counterweights, custom booms/ sticks/ clamshells) - Pierce Pacific Manufacturing, Portland and Young Corporation, Seattle.
Example of Pierce sales/ design/ build/ machine start up process.
https://www.constructionequipmentgu...r-moves-product-from-mighty-mississippi/29073
 

firchk

Member
Joined
May 18, 2022
Messages
9
Location
Texas
Our barge bin is 80x15 it will be laid up long against the bulkhead and we have about a 6 ft gap (small walkway+outer edge of barge) if measured is approximately 30ft from inside bottom corner of barge to the center of the machine track

I was looking for something that isn’t custom

since we have had trouble with wheeled machines I’d rather not a wheeled but track

also the extended boom kits limit how volume significantly in many cases (most applications are unloaded from the ends so a 60ft conversion is typical - prevents relocating the tug)

in our case a big bucket on a 340ish sized machine is kinda what I was thinking as long as I can hit the 30days foot mark - this should net us more volume per bucket

hopefully that makes sense
 

skyking1

Senior Member
Joined
Nov 3, 2020
Messages
7,657
Location
washington
since you are on a bulkhead and earth, size is not a thing so go find a big rig like an old 450 with a 6' cleanup bucket and get with it. Sounds like you can't go wrong.
I'd say any 450 that is priced right with a smooth bucket. A 345 cat is a good enough machine, might be a search to find the cleanup bucket.
 
Top