2007 Summer, Sahara desert. In a region out of GSM and satellite phone coverage. I was there for assembly and trainings for 2 weeks. Briefly, it's the extension of Great Man Made River Project, there are big lakes under the sand, they pump lake water thru giant pipes (each prestressed concrete pipe 20 tons with 4 metres diameter). PC1250 's worked for the preparation of "pipeline ground bed"