earthscratcher
Senior Member
one bay will be a drive thru bay, the other bay will be the working bay,it will have the pit,tie down points and truck lift.i was just going to use conveyer belting when i bring in dozers and trackhoes.any other ideas for floor protection railroad track in concrete ,sheet steel, what would you do? tie down points what are you using,how did you install under concrete.
pit sizes,depth, width ,length. lets see some pictures of some shop floors
pit sizes,depth, width ,length. lets see some pictures of some shop floors