• Thank you for visiting HeavyEquipmentForums.com! Our objective is to provide industry professionals a place to gather to exchange questions, answers and ideas. We welcome you to register using the "Register" icon at the top of the page. We'd appreciate any help you can offer in spreading the word of our new site. The more members that join, the bigger resource for all to enjoy. Thank you!

Grouser extensions, anyone had them installed?

Hallback

Senior Member
Joined
Jun 1, 2011
Messages
2,331
Location
Aberdeen Wa.
Occupation
Gyppo tower logger
I was talking to the Deere tech about installing single bar pads on my shovel logger and their quote for the pads & labor was almost $13k!

Has anyone here installed grouser extensions or had them installed?
I am thinking a 2-2.5" extension every other bar on my current double bar pads.

Just curious of the cost & satisfaction with them.

Thank you.
 

Hobbytime

Senior Member
Joined
Sep 21, 2016
Messages
709
Location
usa
you can look up price of grouser stock online and then get a price to have welded on, I have a track loader with grouser stock welded on every single ridge..im cutting the middle bars out with a plasma cutter as now all the pads do are clog up with mud very tight, the pads that I cut out the middle bar self clean much better...you should make sure each pad is balance so you dont bend or put unwed stress on components..
 

Hallback

Senior Member
Joined
Jun 1, 2011
Messages
2,331
Location
Aberdeen Wa.
Occupation
Gyppo tower logger
Thanks fellas!
I would like to add about 2-2.5" of height to every other bar on the pads of my shovel logger.
PLUS, that will keep me compliant with the timber companies that require double bar grousers for machines on the roads.
 

old-iron-habit

Senior Member
Joined
Nov 22, 2012
Messages
4,233
Location
Moose Lake, MN
Occupation
Retired Cons't. Supt./Hospitals
If you weld them on your self it quite easy if you weld on the front and back of the track so you can do all flat welding. One side from the front and one from the back. You can tack them on top on the side that will be down when you weld them on. You should be able to buy double beveled ones that will be close enough to work on you shovel.
 

furpo

Senior Member
Joined
Jun 26, 2010
Messages
319
Location
New Zealand
If you weld them on your self it quite easy if you weld on the front and back of the track so you can do all flat welding. One side from the front and one from the back. You can tack them on top on the side that will be down when you weld them on. You should be able to buy double beveled ones that will be close enough to work on you shovel.

Ditto. I have done a few machines exactly like this. I use grouser bar extension from trackweld. Most track suppliers should do a similar product. I also prefer to arc weld these on. 5mm Phillips 77's do the trick. if your existing grouser bar is excessively rounded off then get it square first.
 

catman13

Senior Member
Joined
Aug 22, 2011
Messages
435
Location
oregon usa
Occupation
refrigeration engineer/excavation contractor
how are you going to stay compliant with timber companies with single bar grousers when they require double bar ?
 

Hallback

Senior Member
Joined
Jun 1, 2011
Messages
2,331
Location
Aberdeen Wa.
Occupation
Gyppo tower logger
The pads are still double bar pads, one is just a lil taller than the other.​
 

John C.

Senior Member
Joined
Jun 11, 2007
Messages
12,870
Location
Northwest
Occupation
Machinery & Equipment Appraiser
I have seen a couple of companies use single bar pads on their shovel loggers. The only place I've seen compliance issues was on state land.
 

Hallback

Senior Member
Joined
Jun 1, 2011
Messages
2,331
Location
Aberdeen Wa.
Occupation
Gyppo tower logger
Hancock contracts state no single bars on the road. It's dumb as a buncher has to get to the job too!
 

Rob Gunn

Well-Known Member
Joined
Mar 18, 2013
Messages
163
Location
Buchanan, MI
5 years ago I spent 2 full days in the shop mig welding 2" tall x 3/8" thick cold rolled bars (cheap steel found at any steel supply house) to each of my pads on a John Deere 550 dozer. Made a GREAT improvement on traction and so far in the past 5 years I've had no issue. Other than my time it cost me around $150 in steel and mig wire. I guess you can go the more expensive route and buy the hardened pre-cut bars but for my occasional farm use, the soft cheap bars are doing just fine.
 