• Thank you for visiting HeavyEquipmentForums.com! Our objective is to provide industry professionals a place to gather to exchange questions, answers and ideas. We welcome you to register using the "Register" icon at the top of the page. We'd appreciate any help you can offer in spreading the word of our new site. The more members that join, the bigger resource for all to enjoy. Thank you!

Temp Bridge

631G

Senior Member
Joined
Apr 27, 2008
Messages
336
Location
Georgia
Occupation
Civil Superintendent
Has anyone dealt with installing a temp bridge for loader traffic to shuffle equipment and materials across a creek that is not able to be piped temporarily? If you have what beam section did you recall using? I am looking at finding an old equipment trailer and pulling the axels out from underneath it, but thought that possibly buying the steel and decking with some crane mats might get the job done cheaper and faster.
 

mowingman

Senior Member
Joined
Jul 10, 2010
Messages
1,236
Location
SE Ohio
Occupation
Retired
An old RR flatcar works great, if you can find one to buy. You only need the deck and frame, not the wheelsets or couplers. They can be found in various lengths. Check some of the larger scrapyards.
Jeff
 

crane operator

Senior Member
Joined
Mar 27, 2009
Messages
8,314
Location
sw missouri
Trailers are only 8' wide, and if you're using a flatbed, the beams are in a ways, and the outer portion isn't very strong. I'd prefer two trailers side by side, so the loader tires ran down between the main beams.

The rail cars are great because they are wider and much stouter, but they are a lot heavier so it takes a lot bigger equipment to set them.

I suppose you need to start with how long you need the "bridge" to be, and what the width/ weight is of the equipment is that you need to cross it with.

I've installed a old semi trailer and the railroad cars for customers. Neither were temporary. Trailer was for a pasture access across a creek that kept washing out the culvert. Railroad bridge for a similar situation, they just wanted a lot more substantial bridge. Both set on poured abutments.
 

Delmer

Senior Member
Joined
Jan 3, 2013
Messages
8,886
Location
WI
are you allowed to use cribbing to support the span? Wood cribbing to support wood beams and crane mats would be a halfway step between a tube and a bridge that spans the whole creek.
 

redneckracin

Senior Member
Joined
May 19, 2010
Messages
574
Location
Western PA
Occupation
Civil Engineer
Thats a very vague question. You need to find a prefab bridge that is designed or roll the dice and take advice on the internet. Don't forget about the abutments, setting a bridge on bare ground isn't going to hold up very long unless you have an exceptionally large contact area.
 

CM1995

Administrator
Joined
Jan 21, 2007
Messages
13,342
Location
Alabama
Occupation
Running what I brung and taking what I win
What kind of weight and span?
 

skyking1

Senior Member
Joined
Nov 3, 2020
Messages
7,604
Location
washington
I'll echo what redneck and CM said. Get the numbers for span, and the size of machine you want to run over it.
I've been involved with temporary spans up to 88' long supporting a Manitowoc 3900 kitted out to 300,000 pounds. That required serious engineering :D
 

Camshawn

Senior Member
Joined
Jan 25, 2017
Messages
596
Location
Langley BC
Occupation
retired
I saw on Craig’s list, the folding end containers ( used to ship odd and oversized loads) advertised for temp bridges in 20 and 40 foot lengths. Cam
 

631G

Senior Member
Joined
Apr 27, 2008
Messages
336
Location
Georgia
Occupation
Civil Superintendent
Trailers are only 8' wide, and if you're using a flatbed, the beams are in a ways, and the outer portion isn't very strong. I'd prefer two trailers side by side, so the loader tires ran down between the main beams.

The rail cars are great because they are wider and much stouter, but they are a lot heavier so it takes a lot bigger equipment to set them.

I suppose you need to start with how long you need the "bridge" to be, and what the width/ weight is of the equipment is that you need to cross it with.

I've installed a old semi trailer and the railroad cars for customers. Neither were temporary. Trailer was for a pasture access across a creek that kept washing out the culvert. Railroad bridge for a similar situation, they just wanted a lot more substantial bridge. Both set on poured abutments.

My thought was to use an old low boy trailer but those have been hard to find locally. The RR car is a great idea but we’ve only got a Komatsu PC210 and a 135 to move things around with. I don’t think we’d have the needed muscle to do it with those machines. Not to mention I doubt my local scrap yard has a rail car.
We may try landing a flat bed trailer with crane mats underneath to act as abutments.
 

631G

Senior Member
Joined
Apr 27, 2008
Messages
336
Location
Georgia
Occupation
Civil Superintendent
I saw on Craig’s list, the folding end containers ( used to ship odd and oversized loads) advertised for temp bridges in 20 and 40 foot lengths. Cam

This is a great option because there aren’t any axles to remove and it’s already flat on the bottom.
 

suladas

Senior Member
Joined
Jun 30, 2016
Messages
1,731
Location
Canada
Will they clear span 25' and support a 45K lb rolling load?

Depends on which ones there are different specs, but the heavier one's 2 would support that no problem. Looked into it a few years ago at my property to span a ditch, IIRC if you tied 3 of the heavy one's together 20' span was good for around 80,000lbs.
 

suladas

Senior Member
Joined
Jun 30, 2016
Messages
1,731
Location
Canada
Not even close. They are for setting a drill rig on top of soft ground and working on, when you have a nice bog under you. But definitely not for a clear span crossing.

I think you're confusing them with swamp mats. While rig mats are used for that purpose they are also used for spanning, hence why they are so heavy compared to swamp mats.
 

redneckracin

Senior Member
Joined
May 19, 2010
Messages
574
Location
Western PA
Occupation
Civil Engineer
Never seen nor would I recommend using a rig mat as a bridge. Rig mats are heavier than swap mats since a several million pound drilling rig can be set upon them not just a tracked piece of equipment. We used them while drilling gas wells to give the triples something to walk around on while they punched holes a couple thousand feet deep and for protecting the secondary containment. Even the name implies they are to be set upon.

Use a prefab bridge for the weights and more importantly, the spans we are talking about.
 

631G

Senior Member
Joined
Apr 27, 2008
Messages
336
Location
Georgia
Occupation
Civil Superintendent
Wanted to follow up with the forum on what we wound up installing for this work. We used 4EA W12x26 beams placed in pairs to span the creek and then decked it with steel road plates. We set the beams down on crane mats either side of the creek to create what I am going to call the beam seats so they wouldn't sink down under pressure. The road plates were welded to the beams and the plates also welded to one another to keep them together to prevent sliding. The plates being welded to the beams kept them from rotating side to side. This ended up working out very well. The bridge was very stable and let us get the pumps, materials and equipment across the creek. We finished the cased pipe crossing Saturday and will be taking everything down this week once we test out the line with the inspectors.
 